诗词屋>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • When I returned from maternity leave, there was a backlog of work waiting for me.
                是积压的邮件。我休产假回来上班后,有一大堆工作等着我做,可以说。
              • This is a waste of valuable transmission and processing bandwidth and can cause an unacceptable replication backlog to develop.
                这是一个对宝贵的传输和处理带宽的浪费并且可能导致发展出不可接受的复制日志的积压。
              • It is normal to have a lot of user stories in your release backlog.
                在发行版的计划安排中,通常包含了大量的用户描述。
              • Some teams estimate the size of all of the items in their backlog prior to any development.
                有些团队在任何开发之前都要对他们积压中所有条目的大小进行评估。
              • In Scrum, velocity is how much product backlog effort a team can handle in one sprint.
                在Scrum中,速率是一个团队在一个sprint中可以处理的产品backlog的工作量。
              • This will cause the operations backlog items to be higher priority on the backlog.
                这会导致运营相关的待办事项条目得到更高的优先级。
              • New items are discovered and added to the backlog based on customer and user feedback.
                根据客户和用户的反馈,新的待办项会被识别出来并加入到待办事项列表里面。
              • Wrap: Closing the packets, creating a executable version of changes and how they implement backlog requirements.
                封装:关闭程序包,为变更和这些待定需求如何实现创建一个可执行版本。
              • The project backlog is the specific set of work that is required for the project.
                项目backlog是项目需要做的具体的工作集合。
              • This list of tasks becomes the Sprint Backlog.
                任务的列表就成了所谓的代办冲刺。